Regular maintenance work and cleaning

For components in which the tests reveal wear or even malfunctions, repairs or component replacement must be carried out by competent specialist companies and persons (electrical engineers).

Components

Test

Interval

Pneumatic components

Visual inspection for corrosion, damage and correct fastening

Pressure and leakage test

At least annually and before each commissioning process

Electrical components

Visual inspection for corrosion, damage and correct fastening

Functional test

At least annually and before each commissioning process

Earthing

Visual inspection for damage and correct fastening

Continuity test with grounding resistance report (VDE 701)

At least annually

Emergency stop

Functional test

At least annually

 

The controller should be cleaned on a regular basis. Heavy soiling can lead to malfunctions.