Flushing the process gas into the control panel
- Close all valves except LPV (if present).
- Slowly open the process gas source valve and then the HPI valve to fill the entire area in which the process gas is to penetrate (pressure build-up).
- Open valve PLI.
The process source pressure and the gas type properties are to be taken into account here.
The Pressure control panel is now in a condition ready for operation.
If operation is not to be continued following the flushing process, proceed in accordance with "Gas supply interruption".