Flushing the process gas into the control panel
- Close all valves except LPV (if present).
- Open slowly the process gas source valve and then the HPI valve, so to fill the entire area in which the process gas is to penetrate (pressure build-up).
- Open valve PLI.
In this process, the process source pressure and the gas type properties are to be taken into account.
The High pressure panel is now in a condition ready for operation.
If operation is not to be continued following the flushing process, proceed in accordance with "Gas supply interruption".