Connecting the incoming and outgoing lines
All lines must be connected in accordance with the applicable standards and specifications and tested with purge gas (pressure test and leak test). The specifications on dimensioning of the connections are described in the "Design" chapter.
- Connect the exhaust gas outputs of the High pressure panel to the exhaust gas lines.
- Connect the process gas output of the High pressure panel to the consumer.